1-800-524-2188
Search Our Product Line
 
HOME ABOUT US PRODUCT LINES RECONDITIONING SERVICES REPLACEMENT PARTS CONTACT US REQUEST A QUOTE
RECONDITIONING SERVICES
We hear it all the time: "your equipment lasts longer than any body else's"… or "your unit has been running continuously since 1957"…. We hear it so much because it's true, But even Paul O. Abbé equipment needs an overhaul at some point…eventually. When it is finally time for a replacement vessel or a new agitator or an upgrade in electronic controls it is time to contact us at Paul O. Abbé and get our engineers and mechanics to go to work for you again. No job is too small and no job is too big. It is what we do. Ask about our trade-in program if that suits you better.

 

The most "efficient" fill level for a ball mill is to load material equal to 25% of the total volume of the mill. A 40% batch will take twice as long to mill as does the 25% batch. But, depending on your cycle time and unit operations, it may actually be more economical to operate with the "wrong" batch size.

Blending equipment, if operated for too long, can actually "de-mix" the materials that you had blended.

When sizing and specifying the correct vacuum and solvent recovery systems for your vacuum drying equipment, components must be sized for the peak vapor load, not for the average or total moisture to be removed.



Replacement Parts



Downloadable Literature
Electronic Questionnaire




Financing/Leasing Available

Home | Product Lines | Glossary | Site Map | Inventory | Contact Us | Terms & Conditions
Copyright © 2008 Division of Aaron Engineered Process Equipment
Phone: 630-350-2200 Fax: 630-350-9047

Member of Process Equipment
Manufacturers Association